These three tests were essentially checking that adding a note to
something updated its `noteable`'s `updated_at` attribute.
This is well-tested Rails behavior and we shouldn't feel the need to
write an integration test to verify it. At most we should be ensuring
that the association definition adds the `touch: true` option, which we
now do in Note's unit test.
1. We now display the index of the current issuable among all its project's
issuables, of the same type and with the same state.
2. Also, refactored a bit the Issuable helpers into a new IssuablesHelper
module.
3. Added acceptance specs for the sidebar counter.
This commits also fixes two minor issues:
- Ensure notes that the current user is not allowed to see are not
returned in the AJAX notes loading
- Ensure the notes counter badge is decremented of 1 instead of 2
It is same search like we have at issues page. It allows to quickly
filter merge requests based on title or desription. I copy-pasted some
js code from Issues.js. In future search (filtering) logic should be
refactoed into one class for merge requests and issues
Create a new shared module for common issue/merge request behavior,
use `expect` syntax instead of `should`, and avoid `visible: false` in
the `have_css` matcher.
The good:
- You can do a merge request for a forked commit and it will merge properly (i.e. it does work).
- Push events take into account merge requests on forked projects
- Tests around merge_actions now present, spinach, and other rspec tests
- Satellites now clean themselves up rather then recreate
The questionable:
- Events only know about target projects
- Project's merge requests only hold on to MR's where they are the target
- All operations performed in the satellite
The bad:
- Duplication between project's repositories and satellites (e.g. commits_between)
(for reference: http://feedback.gitlab.com/forums/176466-general/suggestions/3456722-merge-requests-between-projects-repos)
Fixes:
Make test repos/satellites only create when needed
-Spinach/Rspec now only initialize test directory, and setup stubs (things that are relatively cheap)
-project_with_code, source_project_with_code, and target_project_with_code now create/destroy their repos individually
-fixed remote removal
-How to merge renders properly
-Update emails to show project/branches
-Edit MR doesn't set target branch
-Fix some failures on editing/creating merge requests, added a test
-Added back a test around merge request observer
-Clean up project_transfer_spec, Remove duplicate enable/disable observers
-Ensure satellite lock files are cleaned up, Attempted to add some testing around these as well
-Signifant speed ups for tests
-Update formatting ordering in notes_on_merge_requests
-Remove wiki schema update
Fixes for search/search results
-Search results was using by_project for a list of projects, updated this to use in_projects
-updated search results to reference the correct (target) project
-udpated search results to print both sides of the merge request
Change-Id: I19407990a0950945cc95d62089cbcc6262dab1a8